2003
1903
1865
2020

Schedule of Front of House Signage for the refurbished Theatre Royal - 1977

Title

Schedule of Front of House Signage for the refurbished Theatre Royal - 1977

Date

28 November 1977

Description

Schedule of all the front of house signs for the refurbished Theatre Royal drawn up by the architects, Renton Howard Wood Levin Partnership

What's the story?

This schedule gives a fascinating insight into the attention to detail shown by the architects, Renton Howard Wood Levin Partnership, and the theatre designer Clare Ferraby, in designing every aspect of the refurbished Theatre Royal
Every front of house sign in the theatre is specified down to the level of gilding and the depth of signage.
Even the pointing hand signs which can still be seen in the foyers are drawn in the required style.

Type

Architectural design schedule

Location of item

Private Collection - Nick Thompson & Clare Ferraby

Rights

Private Collection - Nick Thompson & Clare Ferraby

Contributor

Researcher - June Ellerby

Format

29.7 cm x 21 cm